After walking through the paved road area where the infrastructure is already installed –
We decided to walk the access road beyond the huge mound of dirt to the pond.

I call this the “GATOR HIGHWAY”
Yes – we have seen a small gator in this pond – but as Sherry says – “WHERE’S THE MOTHER”?
This old access road runs right behind our house – the tree line here is protected –
That is the back of our home in the picture – these woods will not be cut or cleared and this old road is blocked off – where another new home has been built.
I hope they make this part of the already trail system we have that goes around the other pond.
This area will be the last to be done in the next phase – suppose to be according to map site plans
A third pond somewhere to the right of this picture eventually.
We have seen many tracks of deer around here as well as other tracks.
People have said they have seen Bobcat tracks and coming home one night –
I saw something bigger than a normal cat on the main highway – ?????
There are five houses to be completed in our phase – and then they are done there- I was told the construction will commence here in the finished area with paved roads sometime in March.
They are selling the lots now – LENNAR is the builder now – new designs and new elevations will be the difference from what we had to choose from.
We shall see what this all looks like a year from now as aI think it is a two-year build-out or more.