Phase one completed – Phase two is almost done – no idea what phase the garden homes are in –
they are conjoined town home-condos across from this entrance but part of our development.
There are numerous homes there completed but looks like less than halfway done.
We walk almost daily weather permitting.
Phase three – all the infrastructure is already in – and two of the roads are paved.
I assume that some have already been sold as I was told construction is supposed to start in March.
It is hard to tell now but they look similar in size to our lots – perhaps a little bit bigger.
The far tree line to the right has a cul-de-sac behind it and I assume will not be cut down.
In this picture, we live beyond this view to the right.
Behind these homes is where the community center is to the right.
This was all woods when we purchased our lot.
I stand where a huge hill of dirt has been piled up – separating the sites here from the clearings behind it. I think this mound of the earth will be pushed back to cover the cleared space or used as a fill when they put in the remaining infrastructure.
According to the site maps – one more pond is yet to be added to the right somewhere in the trees.

There already is an access road right back to the pond which is either the same size as the one completed at the end of our road or bigger.
If you could continue to walk – straight ahead of them is our new home through the woods.

To the right beyond those trees is the mound of dirt.
The next blog will be THE WALK CONTINUED through the cleared area to the pond.