Papa’s World – Drywall done – cabinets in – tile next – getting close!

We pulled up to the front of the house – DRYWALL in the trash bin!

You see – there has been a delay and shortage in drywall – all over the country –

which has held up our completion by a month! Along with inspectors and inspections!

I was excited as this meant the drywall was being put in!

When I walked into the garage – it had the first coat of MUD on!
Then – I went inside and it was all done – first coat of mud – we were back on schedule after four weeks!

It has been a long four to five weeks with hardly any progress – but we prayed and it is now moving forward.

Looking toward the front from the sun room – to the left – hallway – entrance to the bedrooms and bathroom – middle is outer wall to the office – and to the right hallway to laundry room and garage. Open space is vaulted living room.
The kitchen and breakfast nook.
Window to the left – breakfast nook and the yard – rear windows – the outside enclosed lanai.
Looking from the hallway into the living room – to the left – kitchen island and the breakfast nook – to the right – Sherry standing in the sun room. The whole back of the house is windows – open patio behind her through the windows.
Master bedroom with bathroom to the left and hall way door to the right.

And two days later when we visited – the mud on the dry wall was completed – sanded – and we had CABINETS!

Kitchen and Island
Master bathroom
Guest bathroom

We are excited – they told us tile is going in – grading outside – doors to be hung.

Now there is a delay and shortage on PAINT!

Because of the ICE STORM in Texas and the Pandemic.

They told us they would continue doing the things they could until they got the paint.
Master bedroom

Thank you for reading Papa’s World

WHERE FRIENDS MEET THE FAMILY

FAMILY MEETS FRIENDS

MY BLOG: livinglifedoingitmyway.blog

MY CONTACT EMAIL: fitztdf@aol.com

Our new community – Cameron Woods – Ocean Isle Beach – mainland side – LOT # 89!

We are happy – moving forward -perhaps by the time this posts – we will have a move in date!

Our lot is backed by trees that will not be cleared – it is deemed protected wetlands.

We will have lots of roads to walk and new trails going in.

Almost all the purple area has been sold years ago – but no one has seemed to build on them –

maybe a half dozen really big homes!

We do not know why – investment?

You can buy lots there from individuals for a hefty price!

For now it remains paved roads – old growth shaded trees and street lights – utilities

and beautiful green areas and ponds.

SHERRY – CERTIFIED HEALTH COACH

SHERRY’S SITE FOR HEALTH AND NUTRITION: http://www.sf.juiceplus.com

HOME BASED BUSINESS CONTACT: ssherrylynn49@aol.com

PAPA’S WORLD livinglifedoingitmyway.blog

2 thoughts on “Papa’s World – Drywall done – cabinets in – tile next – getting close!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s