In early August of last year, we signed the contract for the materials – it had to be manufactured –
and because of the Pandemic – everything was delayed!
They worked steadily – efficiently and seemed in no time they were almost done.
Everything was made to order and just what we wanted.
All that was left was for them to caulk everything inside and outside –
Which when done made it look all sealed and neat and clean lines.
The windows slide all the way down or all the way up – or we can take them out.
We waited a long time to do this and finally, it is done.
It will be dry and warm – in the winter we have a small heater if we are sitting out here.
A very wise investment and it looks really great!
Thanks for reading Papa’s World – MY SITE: livinglifedoingitmyway.blog