The community center – pickleball courts and pool will be on our left at the top of the hill and our mailboxes will be on the right-hand side in a small cul-de-sac.
Inspections – material shortages – labor – One developer sold to another – numerous delays!
But when completed we can walk easily to it and it will be so nice –
the inside has been drywalled and painted in 80 % of the building –
the area to the right in the pictures has yet to be drywalled.
I have no idea why it was not done all the way through – but the drywall is sitting in there.
Inside are bathrooms – kitchen, meeting room, fireplace, workout area, lounging area, etc.
The main entrance – gated – is to the right.
Once back on Waterway road – it is straight back to the house –
or you can choose to do five other cul-de-sacs – some with houses most are vacant.
Or walk the road to the pond – to the end of the cul-de-sac or go to the new construction area and walk.
If you choose to walk everything in Cameron Woods plus the garden homes –
it would be close to seven or eight miles!